Post Page Advertisement [Top]

ABSTRACT


Shift management system is used for maintaining and managing the schedules and the related details of the employees working in different projects and in different shifts.
In an era where having a website of your own is a matter of prestige for some and necessity for others. Management of these websites is still an area which is ignored or done in traditional manner. In a changing world no corporate company or any website owner would like to host a static content over their site. We in a system called ‘SHIFT MANAGEMENT SYSTEM’ provide a structural mechanism of building the content for your site. It also provides us a testing area where the created content is being hosted.
The structural mechanism provides in this system requires personal with specialization in different areas.  The entire content is grilled through various phases before being made available for the website. The content being created or hosted can be placed into different categories available with the system. The crucial content can even be placed in a protected zone which can be accessed by only the registered users.


Existing System:
a. Managing shifts for different employees.
b. Maintaining information about entities like – the project the employee is working on, his/her leader, different shifts worked in with the respective number of shifts. 
c. Calculation of shift-related allowances for the employees.
d. Different interfaces corresponding to different user-levels.
e.   Employee scheduling: It is the process of producing daily schedules for individual employees.



Proposed System:
     The main objective of the system is to minimise the troubles that might come in scheduling the employees and offer a better solution than what is currently existent in the market. The system has been designed to take care of schedule management and the related details about the employees working in different projects and in different shifts.
1)      Organizations in IT pitch for employee scheduling software, basically for      some important reasons:
2)      24 x 7 project support requires staff presence at any time of the day.
3)      Multiplicity of projects with different levels of criticality are to be maintained
4)      To effectively change the employee working hours to ensure that:
a)      Project development is not paused due to employee unavailability
b)      Employees are not overworked
c)      The 24 hours of the clock are utilized, rather than a “standard working day”


Modules:
·         Manager
·         Employee
·         Supervisor/Administrator
·         Shift Details
1.      Manager is responsible for his team and can’t have the details of other teams which results in security to the system.
2.      The employees can be given the facility to view their shift details as well as the allowances that they are expected to get. Employee backup facilities can be incorporated in case an employee is not able to turn up for the designated shift.
3.      Supervisor/Administrator’s job can be decomposed to set / edit shift details as per the project requirements so that they can be implemented easily and more productively.
4.      The allowances of the employees who work in different shifts is calculated by the system for the benefit of the GAP / Finance department.

Advantages:
d)     The Project development is not paused due to employee unavailability.
e)      Less workload for employees.
f)       The 24 hours of the clock are utilized rather than a “standard working day”

System Requirement Specification: 

Hardware Requirements:

•I2 Processor and Above
•RAM 1GB and Above
•HDD 20 GB Hard Disk Space and Above

Software Requirements:

•WINDOWS OS (XP service pack 2 /windows 2007 Server)
•Visual Studio .Net 2008(according requirement)
•Visual Studio .Net Framework (Minimal for Deployment)                          
•SQL Server 2008(according requirement) Enterprise Edition


No comments:

Post a Comment

Bottom Ad [Post Page]

| Designed by Colorlib