AUTOMATION OF UNMANNED RAILWAY GATE CONTROL SYSTEM USING 89S52
MICROCONTROLLER
ABSTRACT
Railways,
being the cheapest mode of transportation are preferred over all the other
means. When we go through the daily newspapers, we come across many railway
accidents occurring at unmanned railway crossings. This is mainly due to the
carelessness in manual operations or lack of workers.
In order to overcome these
dangerous problems we, in this project came up with a solution for the same.
Using simple electronic components we have tried to automate the control of
railway gates. This project is a standalone automatic unmanned railway gate
control system using AT89S52 microcontroller. The main aim of this project is
atomizing the unmanned railway gate. i.e., the gate is closed automatically
when ever the train comes and gate is opened after the train leaves the railway
– road crossing. The arrival of train in either direction can be identified
using this project. Use of embedded technology makes this closed loop feedback
control system efficient and reliable. Micro controller (AT89S52) allows
dynamic and faster control. Liquid crystal display (LCD) makes the system
user-friendly. AT89S52 micro controller is the heart of the circuit as it
controls all the functions.
The
system comprises of two IR Transmitter-Receiver pairs. One IR TX – Rx
pair is located at one end of the railway gate. The second pair is located at
another end of the gate. In each pair the TX and Rx are arranged face to face
across the railway track. i.e., TX is placed at one side of the track and the
receiver RX at another side of track. The Rx should continuously get the signal
from the transmitter.
Whenever
any train is arriving on the track, the IR signal gets disturbed due to the
interruption of the train. Thus the micro controller identifies the arriving of
train. Before closing the gate the microcontroller gives siren to alert the
people who are on the track. After 30 sec, the controller will close the gate
by rotating the DC motor. For the opening of the gate, the micro controller
should know whether the train has left the crossing or not. The second IR pair
is used for this purpose.
The
second IR pair identifies the train since the IR signal gets disturbed when it
comes in between TX and RX. The microcontroller will wait till the last
compartment and when it left the IR pair, the receiver again gets IR signal.
Hence the microcontroller knows that the train left the gate. Till this time
the gate is closed. Now, after the train left the crossing, the microcontroller
will open the gate by rotating the DC motor. LCD displays the status of the
train.
This project uses regulated 5V,
500mA power supply. 7805 three terminal voltage regulator is used for voltage
regulation. Bridge type full wave rectifier is used to rectify the ac out put
of secondary of 230/12V step down transformer.
BLOCK DIAGRAM
No comments:
Post a Comment